Enviro EF5-DIAL-A-FIRE Especificações Página 1

Consulte online ou descarregue Especificações para Fogões Enviro EF5-DIAL-A-FIRE. Enviro EF5-DIAL-A-FIRE Specifications Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
1

3/($6(5($'7+,6(17,5(0$18$/%()25(,167$//$7,21$1'86(
2)7+,63(//(7%851,1*5220+($7(5)$,/85(72)2//2:7+(6(
,16758&7,216&28/'5(68/7,13523(57<'$0$*(%2',/<,1-85<
25(9(1'($7+
&217$&7<285%8,/',1*25),5(2)),&,$/6$%2875(675,&7,216
$1',167$//$7,21,163(&7,215(48,5(0(176,1<285$5($
,167$//(5/($9(7+,60$18$/:,7+7+(:22'6729(
&21680(55(7$,17+,60$18$/)25)8785(5()(5(1&(
Version française: www.enviro.com/fr

0
) 5 ( ( 6 7 $ 1 ' , 1 * 3 ( / / ( 7 6 7 2 9 (
:$55$17<5(*,675$7,21
HQYLURFRPZDUUDQW\
Vista de página 0
1 2 3 4 5 6 ... 39 40

Resumo do Conteúdo

Página 1 - HQYLURFRPZDUUDQW\

13/($6(5($'7+,6(17,5(0$18$/%()25(,167$//$7,21$1'86(2)7+,63(//(7%851,1*5220+($7(5)$,/85(72)2//2:7+(6(,16758&7,

Página 2 - Table of Contents

10InstallationVENT TERMINATION REQUIREMENTS:IT IS RECOMMENDED THAT YOUR PELLET STOVE BE INSTALLED BY AN AUTHORIZED DEALER/INSTALLER. Figure 7: Use in

Página 3 - Introduction

11EXHAUST AND INTAKE LOCATIONS:Figure 9: P3 Inlet and Outlet Location. EXHAUSTBase of unit to center of flue 10.5 in (265 mm)Center of unit to ce

Página 4

12Figure 11: Corner Installation. CORNER THROUGH WALL INSTALLATION:InstallationMOBILE HOME INSTALLATION:● Secure the heater to the floor using the two

Página 5

13InstallationHORIZONTAL EXHAUST THROUGH WALL INSTALLATION:Vent installation: install vent at clearances specified by the vent manufacturer.A chimney

Página 6

14Figure 14: Venting horizontally with rise. Figure 15: Venting with concrete wall behind unit . Installation10. Install a vertical pipe, or if all re

Página 7

15Figure 16: Inside Vertical Installation. 1. Choose a stove location that is ideal. See the section “DECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE

Página 8

16InstallationHEARTH MOUNT INSTALLATION:Figure 19: Freestanding hearth mount installation overview. Refer to Figures 18 and 19.1. Install the hearth p

Página 9

17InstallationEXTERIOR MOUNTED EXHAUST BLOWER (20-070):1. Remove the left hand cabinet side by removing the six mounting screws down the front. L

Página 10 - Installation

18InstallationTHROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - HORIZONTAL TERMINATION:Electrical Cable90° Elbow45°Elbow with Rodent screen or stai

Página 11

19Roof SheathingRain CapRoof FlashingRoof RaftersCeiling JoistsVent PipeExterior Wall SheathingOutside Vent TerminationInstallationTYPICAL THROUGH WAL

Página 12

2Table of ContentsIntroduction...3 Im

Página 13

20SpecificationsDIMENSIONS AND SPECIFICATIONS:Figure 27: Dimensions of P3. 15 1/2"(389 mm)5 1/2"(143 mm)20 1/2"(526 mm)35"(886 mm)

Página 14

21Operating InstructionsCONTROL BOARD FUNCTIONS:1. POWER BUTTON: This is the green button with the power symbol, it is used to turn the unit on and o

Página 15

22Figure 29: Slider/Damper Adjustment TURNING YOUR PELLET STOVE OFF:To turn off your Pellet stove just press the Power button. This will not shut off

Página 16

23Figure 30: Efficient Flame.Operating InstructionsFor less experienced installers or owners a magnehelic gauge can be used to determine the proper Da

Página 17

242-3 Days / Weekly Semi-annually or 2 Tons of FuelBurn Pot and Liner Exhaust VentHeat Exchanger Tubes Air IntakeAsh Pan Blower MechanismsDoor Glass

Página 18

25AIR INTAKE (semi-annually)Routine Cleaning and MaintenanceDOOR GLASS CLEANING (2-3 days) Cleaning of the glass must only be done when stove is cold.

Página 19

26Figure 35: P3 Heat Exchanger TubesHEAT EXCHANGER TUBES (2-3 days)• The heat exchanger tubes are located behind the Louver assembly. To access Heat

Página 20 - Specifications

27Routine Cleaning and MaintenanceFIREBOX PANELSThe paint on the steel firebox panels may peel. This is due to extreme conditions applied to the paint

Página 21 - Operating Instructions

28TroubleshootingDO NOT:● Service the stove with wet hands. The stove is an electrical appliance, which may pose a shock hazard if handled improperly

Página 22

29Troubleshooting3. E3 on LED Display (Proof of Fire Failure)• If a fire is not detected, or if the fire has gone out the display will read E3 becaus

Página 23

3IntroductionIMPORTANT SAFETY DATA:Please read this entire Owner’s Manual before installing or operating your ENVIRO Pellet Stove. Failure to follow t

Página 24 - Air Intake Tube

30Troubleshooting6. Auger is not Feeding Pellets.• If this is the first time starting the unit or during the previous burn the unit ran out of pellet

Página 25 - Figure 33: P3 Open

31RedRedBrownBrownWhiteWhite115VWhiteWhiteWhite (Common)OrangeOrangeOrangeOrangeYellowYellowGreyGreyPurplePurpleBlue115VBlackBlack (Hot)BlackSupplied

Página 26 - Figure 36: P3 Firebox Panels

32Parts ListRef. # Description Part #1 120°F Ceramic Fan Temperature Sensor EC-0012 Auger Motor - 115V EF-0013 High Limit Temp Sensor 200°F (93°C) Man

Página 27

33Ref. # Description Part #32 Top Cast Mount Plate 50-295333 Hopper Hinge Set (Left And Right) 50-295434 Top Cabinet Mount Set (2) 50-295535 Bottom Ca

Página 28 - Troubleshooting

34282919393236384518212017404630244123434442313334353725P3 - STEEL PARTSParts Diagram

Página 29

351516132281139101447212651Parts Diagram P3 - COMPONENTS

Página 30

36SAMPLEENVIRO MODEL / MODELE ENVIRO: P3LISTED ROOM HEATER, PELLETIZED FUEL ONLYSUITABLE FOR MOBILE HOME INSTALLATION (CONCU POUR MAISON MOBILES)REPOR

Página 32 - Parts List

38NAME OF OWNER:_________________________________________ADDRESS:_____________________________________________________________________________________

Página 33

39Notes

Página 34 - Parts Diagram

4IntroductionSAFETY WARNINGS AND RECOMMENDATIONS:Caution: Do not connect to any air distribution duct or system. Do not burn garbage or flammable flui

Página 35

40MANUFACTURED BY:SHERWOOD INDUSTRIES LTD. 6782 OLDFIELD RD. SAANICHTON, BC, CANADA V8M 2A3www.enviro.comMay 15th, 2012C-14329

Página 36 - Rating Label

5operation. If this power cord should become damaged, a replacement power cord must be purchased from the manufacturer or a qualified ENVIRO dealer. B

Página 37

6IntroductionRATING LABEL LOCATION:The rating label is located on the back of the ash pan access cover.PELLET QUALITY:Pellet quality is important, ple

Página 38 - Installation Data Sheet

7InstallationDECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE:1. Check the “Clearances to Combustibles” section for proper spacing.2. Do not obtai

Página 39

8InstallationASSEMBLY1. First install the hearth pad if you plan on using it. You may have to unscrew feet to raise unit up. Tilt the unit so it is b

Página 40 - May 15th, 2012

9InstallationBack Wall 4in (10cm)Adjacent Wall 3in (7.5cm)Side Wall 8in (20cm)Hearth Pad 6in (15cm)CLEARANCES TO COMBUSTIBLES:IMPORTANT: The P3 must h

Comentários a estes Manuais

Sem comentários