13/($6(5($'7+,6(17,5(0$18$/%()25(,167$//$7,21$1'86(2)7+,63(//(7%851,1*5220+($7(5)$,/85(72)2//2:7+(6(,16758&7,
10InstallationVENT TERMINATION REQUIREMENTS:IT IS RECOMMENDED THAT YOUR PELLET STOVE BE INSTALLED BY AN AUTHORIZED DEALER/INSTALLER. Figure 7: Use in
11EXHAUST AND INTAKE LOCATIONS:Figure 9: P3 Inlet and Outlet Location. EXHAUSTBase of unit to center of flue 10.5 in (265 mm)Center of unit to ce
12Figure 11: Corner Installation. CORNER THROUGH WALL INSTALLATION:InstallationMOBILE HOME INSTALLATION:● Secure the heater to the floor using the two
13InstallationHORIZONTAL EXHAUST THROUGH WALL INSTALLATION:Vent installation: install vent at clearances specified by the vent manufacturer.A chimney
14Figure 14: Venting horizontally with rise. Figure 15: Venting with concrete wall behind unit . Installation10. Install a vertical pipe, or if all re
15Figure 16: Inside Vertical Installation. 1. Choose a stove location that is ideal. See the section “DECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE
16InstallationHEARTH MOUNT INSTALLATION:Figure 19: Freestanding hearth mount installation overview. Refer to Figures 18 and 19.1. Install the hearth p
17InstallationEXTERIOR MOUNTED EXHAUST BLOWER (20-070):1. Remove the left hand cabinet side by removing the six mounting screws down the front. L
18InstallationTHROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - HORIZONTAL TERMINATION:Electrical Cable90° Elbow45°Elbow with Rodent screen or stai
19Roof SheathingRain CapRoof FlashingRoof RaftersCeiling JoistsVent PipeExterior Wall SheathingOutside Vent TerminationInstallationTYPICAL THROUGH WAL
2Table of ContentsIntroduction...3 Im
20SpecificationsDIMENSIONS AND SPECIFICATIONS:Figure 27: Dimensions of P3. 15 1/2"(389 mm)5 1/2"(143 mm)20 1/2"(526 mm)35"(886 mm)
21Operating InstructionsCONTROL BOARD FUNCTIONS:1. POWER BUTTON: This is the green button with the power symbol, it is used to turn the unit on and o
22Figure 29: Slider/Damper Adjustment TURNING YOUR PELLET STOVE OFF:To turn off your Pellet stove just press the Power button. This will not shut off
23Figure 30: Efficient Flame.Operating InstructionsFor less experienced installers or owners a magnehelic gauge can be used to determine the proper Da
242-3 Days / Weekly Semi-annually or 2 Tons of FuelBurn Pot and Liner Exhaust VentHeat Exchanger Tubes Air IntakeAsh Pan Blower MechanismsDoor Glass
25AIR INTAKE (semi-annually)Routine Cleaning and MaintenanceDOOR GLASS CLEANING (2-3 days) Cleaning of the glass must only be done when stove is cold.
26Figure 35: P3 Heat Exchanger TubesHEAT EXCHANGER TUBES (2-3 days)• The heat exchanger tubes are located behind the Louver assembly. To access Heat
27Routine Cleaning and MaintenanceFIREBOX PANELSThe paint on the steel firebox panels may peel. This is due to extreme conditions applied to the paint
28TroubleshootingDO NOT:● Service the stove with wet hands. The stove is an electrical appliance, which may pose a shock hazard if handled improperly
29Troubleshooting3. E3 on LED Display (Proof of Fire Failure)• If a fire is not detected, or if the fire has gone out the display will read E3 becaus
3IntroductionIMPORTANT SAFETY DATA:Please read this entire Owner’s Manual before installing or operating your ENVIRO Pellet Stove. Failure to follow t
30Troubleshooting6. Auger is not Feeding Pellets.• If this is the first time starting the unit or during the previous burn the unit ran out of pellet
31RedRedBrownBrownWhiteWhite115VWhiteWhiteWhite (Common)OrangeOrangeOrangeOrangeYellowYellowGreyGreyPurplePurpleBlue115VBlackBlack (Hot)BlackSupplied
32Parts ListRef. # Description Part #1 120°F Ceramic Fan Temperature Sensor EC-0012 Auger Motor - 115V EF-0013 High Limit Temp Sensor 200°F (93°C) Man
33Ref. # Description Part #32 Top Cast Mount Plate 50-295333 Hopper Hinge Set (Left And Right) 50-295434 Top Cabinet Mount Set (2) 50-295535 Bottom Ca
34282919393236384518212017404630244123434442313334353725P3 - STEEL PARTSParts Diagram
351516132281139101447212651Parts Diagram P3 - COMPONENTS
36SAMPLEENVIRO MODEL / MODELE ENVIRO: P3LISTED ROOM HEATER, PELLETIZED FUEL ONLYSUITABLE FOR MOBILE HOME INSTALLATION (CONCU POUR MAISON MOBILES)REPOR
38NAME OF OWNER:_________________________________________ADDRESS:_____________________________________________________________________________________
39Notes
4IntroductionSAFETY WARNINGS AND RECOMMENDATIONS:Caution: Do not connect to any air distribution duct or system. Do not burn garbage or flammable flui
40MANUFACTURED BY:SHERWOOD INDUSTRIES LTD. 6782 OLDFIELD RD. SAANICHTON, BC, CANADA V8M 2A3www.enviro.comMay 15th, 2012C-14329
5operation. If this power cord should become damaged, a replacement power cord must be purchased from the manufacturer or a qualified ENVIRO dealer. B
6IntroductionRATING LABEL LOCATION:The rating label is located on the back of the ash pan access cover.PELLET QUALITY:Pellet quality is important, ple
7InstallationDECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE:1. Check the “Clearances to Combustibles” section for proper spacing.2. Do not obtai
8InstallationASSEMBLY1. First install the hearth pad if you plan on using it. You may have to unscrew feet to raise unit up. Tilt the unit so it is b
9InstallationBack Wall 4in (10cm)Adjacent Wall 3in (7.5cm)Side Wall 8in (20cm)Hearth Pad 6in (15cm)CLEARANCES TO COMBUSTIBLES:IMPORTANT: The P3 must h
Comentários a estes Manuais